Projects

Highways

Van–Başkale (Güzeldere) Road

Van–Başkale (Güzeldere) Road

Technical scope

Work on the divided road and twin-tube tunnel in the Güzeldere section of the Van–Başkale route began in 2013. The project covered the transport connection through mountainous terrain and the Güzeldere Pass.

Historical status
Ongoing in 2016
Left tube
3,136 m
Right tube
3,137 m
Pass elevation
2,730 m

Related work